How long does a kitchen fitter take?

Jamie Connor • January 17, 2025

How Long Does a Kitchen Fitter Take?


Typical Duration of a Kitchen Fitting

For a standard kitchen installation, you can expect the process to take between 5 and 10 days. However, this timeframe can vary depending on the complexity of the project, the size of the kitchen, and whether additional works are required.


Here’s a breakdown of what might be involved:


  1. Removal of the Old Kitchen (1-2 Days) The first step is to strip out the existing kitchen. This includes removing cabinets, appliances, and worktops. Depending on the condition and size of your kitchen, this can take one to two days.
  2. Preparation and Repairs (1-3 Days) Before fitting begins, the space needs to be prepared. This could involve electrical rewiring, plumbing adjustments, plastering, or even flooring. The time required will depend on the extent of the work needed.
  3. Installing Units and Worktops (3-5 Days) The main fitting phase includes the installation of cabinets, worktops, and appliances. This is usually the most time-consuming part of the process. If you’ve opted for bespoke or high-end materials, such as quartz or granite worktops, additional time may be needed for templating and fitting.
  4. Final Touches and Finishing (1-2 Days) Once the main elements are in place, the fitter will focus on the finishing touches. This includes fitting handles, sealing edges, and testing appliances to ensure everything is in working order.

Factors That Affect the Timeline


Several factors can impact how long your kitchen fitting takes:


  • Size and Layout: A larger kitchen or a more complex layout may require more time to complete.
  • Customisation: Bespoke designs or unique features, such as integrated lighting or custom cabinetry, can add to the duration.
  • Additional Work: Structural changes, such as removing walls or installing new flooring, will extend the timeline.
  • Availability of Materials: Delays in sourcing or delivering materials can cause unforeseen hold-ups.
  • Unexpected Issues: Hidden problems, such as outdated wiring or damp, may need to be addressed before the fitting can proceed.


How to Keep Your Project on Track


To ensure your kitchen renovation runs smoothly and stays within the estimated timeframe, consider these tips:


  • Plan Ahead: Choose your design, materials, and appliances well in advance to avoid delays.
  • Hire Experienced Fitters: A professional kitchen fitter with a proven track record will work efficiently and anticipate potential issues.
  • Communicate Clearly: Maintain open communication with your fitter and ensure you’re both aligned on the schedule.
  • Be Flexible: Allow for a little extra time in your plans to accommodate any unexpected challenges.


Conclusion


While the average kitchen fitting takes between 5 and 10 days, every project is unique. By understanding the factors that affect the timeline and working with experienced professionals, you can minimise disruptions and enjoy your dream kitchen sooner.


Ready to transform your kitchen? Contact us today to discuss your project and get a tailored timeline from our expert fitters.


By Jamie Connor January 20, 2025
The Top Bathroom Trends for 2025
By Jamie Connor January 17, 2025
How Much Does a Bathroom Cost?
By Jamie Connor January 17, 2025
How much does a new kitchen cost?
Share by: